Matters needing attention in construction of embedded channel
Embedded groove embedded parts must be buried in accordance with the design drawings on location, use the relevant specifications of embedded parts, not be casually installed, to accept the small embedded parts needed to install strong place, this is very dangerous, is directly related to the safety of the curtain wall, pre buried channel embedded parts construction can never cut corners. At the same time, the strength of the concrete structure connected to the building is lowest C20.
The main part of the pre buried rib type buried anchor position groove in the construction of embedded parts should be placed in a concrete member in the line, to prevent the generation of displacement in the concrete pouring process. In the process of concrete pouring, should be sent to professional care, if there is deviation can be corrected in time.